Replacing lagging on Vacuum Tower
PetroIneos had a very tight schedule to complete this task as HSE were stopping people from going in the tower until Temporary Lighting was fixed. Originally, they had planned to use fixed Lighting
Read More
SA Equip offers cost-effective EX Power and Lighting Equipment in Morecambe Bay to Extend the life of Rhyl Field
Challenges ATEX certified products were required as the platform was still processing gas. Limited capacity on board led to the necessity for portable power solutions. Spirit Energy were looking to reduce costs and extend the life of the Rhyl Field, SA Equip products were selected for use on the Normally Unmanned Installation enabling effective power distribution and cost-savings. […]
Read More
SA LUMIN Tasklight provides optimum lighting at Shell Nederland Raffinaderij B.V.
Challenges Certain pumps were set-up onsite in such a way that the standard lighting across the plant did not provide enough lighting. There was also insufficient lighting, particularly in areas of the plant that were difficult to reach. This resulted in having to take a large amount of equipment including extension leads and additional lights […]