Provide power supply to the Solan
Bi-Fab had the task of painting the legs for the Solan platform. They needed lighting and ventilation inside the tubes so EX power was needed. They had a shortage of power supply around the area so they needed to bring in a system. SA supplied the SA POWERNET ATEX MDU (Mains Distribution Unit) and also Transformers.
Read MoreSA Equip offers cost-effective EX Power and Lighting Equipment in Morecambe Bay to Extend the life of Rhyl Field
Challenges ATEX certified products were required as the platform was still processing gas. Limited capacity on board led to the necessity for portable power solutions. Spirit Energy were looking to reduce costs and extend the life of the Rhyl Field, SA Equip products were selected for use on the Normally Unmanned Installation enabling effective power distribution and cost-savings. […]