Provide power supply to the Solan

Bi-Fab had the task of painting the legs for the Solan platform. They needed lighting and ventilation inside the tubes so EX power was needed. They had a shortage of power supply around the area so they needed to bring in a system. SA supplied the SA POWERNET ATEX MDU (Mains Distribution Unit) and also Transformers.

Read More
March 11, 2022

Meeting the Challenges of Offshore Temporary Lighting & Power

Case Study: Mike Lafferty, E&I Maintenance Supervisor responsible for leading a team of electrical technician offshore